So, for some reason we have various problems in all 3 bathrooms. The downstairs toilet was leaking from the tank, the upstairs guest bathroom kept running, and in our master bath, the caulking along the floor and shower needed replacing. Lets start there...
Cesar removed the old caulking to discover that there was 1/4 inch gap between the linoleum and sub-floor and the shower. sigh... so, after some time at Home Depot, we decided to fill in the space with silicone caulking and then put regular caulking over it and then use a tub/floor transition strip. We're only at the silicone caulking stage. It takes a while to dry. So, this project is my job.
Cesar has been replacing the innards of the downstairs and guest toilets. Its a pain in the ass. He's done with downstairs and is now working on upstairs. I told him he was going to have to pull his pants down a bit though to make it authentic.
Currently listening to: The Denial Twist by the White Stripes
No comments:
Post a Comment